Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | South Dakota |
Type of Government: | Federal |
Category: |
|
Posted: | Apr 23, 2024 |
Due: | May 21, 2024 |
Solicitation No: | 1240LT24Q0038 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment A0001 - This Amendment serves to answer currently submitted questions and correct files uploaded to
SAM.gov. The file being corrected is attachment 2. "Spearfish WC ROOF Replacement Specs."
This file is being removed and is replaced with the correct specifications of the same name
with 4-23-24 included within that name. All quotes should be based off of the newly
uploaded specs:
2. Spearfish WC Roof Replacement Specs 4-23-24
-----------------------------------------------------------------------------------------------------------------------
This Project is located at the Spearfish Work Center within Black Hills National Forest. The
scope of work for this project includes removal of existing asphalt roofing system to the deck,
inspection of the deck and replacement of deck material as needed, and installing a new asphalt
roofing system on the Work Center Shop. Work also includes removal and replacement of Shop
gutters and downspouts.
The Contractor shall be responsible for field verifying all dimensions and quantities of materials
required on this project.
ALL construction activities shall be performed in accordance with all applicable OSHA
standards or regulations. Some of the safety hazards that may be encountered while working on
this site will be use of ladders, lifts, hoists, various hand tools, working on sloped surfaces, use of
fall protection equipment, and use of applicable PPE.
The Contractor will be required to cooperate with Government during construction operations to
minimize conflicts and facilitate Government usage. Work shall be performed so as not to
interfere with Government's day-to-day operations. Work shall be scheduled to minimize
impacts to Government. All constructions operations shall be confined to immediate area of
work. Contractor shall sweep and clean work areas and accessways daily to remove nails,
screws, staples and other construction debris and minimize hazards to government employees,
vehicles, and the public. Contractor shall not disturb portions of site that are not included in the
described Work.
Contractor shall provide schedules in electronic format and include a written summary narrative
to explain basis of approach to work. Schedule contract work and monitor progress using a
Critical Path Method (CPM) or similar type scheduling system. Prepare construction Schedule
to complete the Work within the contract time requirement.
Apr 17, 2024 | [Solicitation (Original)] SF WC Shop Roof Replacement |
May 3, 2024 | [Solicitation (Updated)] SF WC Shop Roof Replacement |
With GovernmentContracts, you can:
Follow Fort Randall Internal Erosion Mitigation Active Contract Opportunity Notice ID W9128F24B0001 Related
Federal Agency
Bid Due: 6/05/2024
Follow Fort Randall Powerhouse Restroom Rehabilitation Active Contract Opportunity Notice ID W9128F24B0007 Related
DEPT OF DEFENSE
Bid Due: 7/09/2024
24SOI10697 A&E Services, SD Dept of Transportation Various Engineering Services Attachments SOI Document.pdf
State Government of South Dakota
Bid Due: 6/14/2024
24RFP052324 Sourcewell Fitness Equipment with Related Accessories Attachments 04/04/2024 2:15 PM CT 04/04/2024
State Government of South Dakota
Bid Due: 5/23/2024